THREE-STORY BUILDING WITH MAZDA SHOWROOM

Mazda Makati, a brand new facility located at 2301 Don Chino Roces Avenue Extension in Makati City, opens its doors on January 18, 2016. This newly-built flagship Mazda dealership houses a 2,233 square-meter display area that can showcase 12 car display of Mazda’s latest SKYACTIV-equipped and KODO: Soul of Motion-inspired vehicles at any given time. Mazda Makati also has 16 service bays to handle a full range of repairs from check-ups and Preventive Maintenance Services (PMS) to body collision repair and repainting.

  • THREE STOREY BLDG. WITH MAZDA MAKATI SHOWROOM RETROFITTING WORKS (BD008-19)
  •  
  • Retrofitting of the structure including surface Preparation, removal of existing finishes, grinding of uneven surfaces, removal of concrete laitance and rounding of corners. strengthening of beam/girder using Carbon Fiber Sheet (CFS) to increase the load carrying capacity of the structure and also improve the service ability of the girder.
  •  
  • Location: 2301 Don Chino Roces Extension Makati City
  • Client: RPDEV Enterprise
  • Date Started:  April 02, 2019
    Completion Date:  April 26, 2019
  • The building was retrofitted to its best quality by the application of Carbon Fiber Sheets (CFS) around the girders, and beams of the building to be strengthen. The result of these processes could be long-lasting and efficient.
  • 1. Removal of loose materials, and Concrete Plaster by means of chipping and grinding.
    2. Application of Carbon Fiber Sheet (CFS) with Chemical Epoxy resins
    3. Restoration of bottom slab, girder and beam on Affected by Carbon Fiber Sheets (CFS) Application
    4. Protective Coating for concrete Structures (Skim Coat)/ Plastering Works
    5. Painting Works (Masonry, and Concrete)